Installation
The Skystream 3.7® was designed to be easily installed. Alaskan Wind Industries will help with all aspects of the installation.
Once contract is signed and have decided that Wind Energy is right for you, Wind Industries will issue you a passcode to enter the AKWI members site which provides all Timelines, HEA applications,
interconnection agreements, Permit request forms & Instructions, sample letters for convenience, Grant Paperwork filled out, Rebate instructions, upcoming events, new product information and more.
Below is information to get you started on deciding if Wind Energy is right for you:
First steps include permiting, HEA Interconnection and Checking Ordinance:
Sample HEA interconnection (JPG)
Sample small wind ordinance (MS Word)
Small Wind & Your Neighborhood Fact Sheet (PDF)
Small Wind & Birds Fact Sheet (PDF)
DETERMINE PROPER LOCATION
STEP 1: Determining your wind resourceThere are several ways to ensure you have at least a 5 mph average wind speed:
- 3 Tier Website (login: info@akwindindustries.com Pass: wind123)
- Have AK Wind Industries to come out and install a wind sensor. This is a free service with AK Wind Industries. Schedule Sensor Installion Here
STEP 2: Locating the system on your property
The general rule of thumb is to install your Skystream at least 20 feet (6 m) above any surrounding trees or structures in a 250 foot (76 m) radius.
STEP 3: Ensure proper generator height
In most cases, a taller tower will allow you to generate more energy. Taller towers, however, increase the cost of your installation and may not be allowed in some areas. A Skystream 3.7 commonly requires a monopole or guyed tower. Below you’ll find a siting guide and information on the most common tower options.
For more information, Please contact us anytime (907) 776-7664